Turnkey hammam in Almaty
We create hammams in homes and spas in Almaty. Complete projects start from ₸1 million: before mosaic installation, we agree substrates, slopes, waterproofing, heating, steam generator and maintenance access.
Ideas for your steam room
Design visualizations, not photos of completed projects.
Three foundations of your future hammam
What stage is your hammam at?
You have a room at home
You need to know whether there is enough height, where equipment will go and how moisture will be removed. We check the initial constraints before choosing mosaics.
Discuss your requirements →
You are planning a spa area
Frequent use affects the steam generator, water treatment, maintenance and drying. The operating schedule sets the design requirements.
Discuss your requirements →
Preparation has already started
Substrates or utilities have been installed by another team. Slopes, penetrations and compatibility of existing decisions must be checked before continuing.
Discuss your requirements →The hammam as a complete wet-area system
The scope covers work inside the steam room and agreed equipment. External utility connections, changes to load-bearing structures and building construction require separate consideration.
Substrates and drainage
Agreed before installationWe check geometry, form surfaces and coordinate drains. Lounger, dome and penetration positions are agreed with layer thicknesses and drainage direction in mind.
Discuss →
Waterproofing and heating
Agreed before installationWe select a compatible system for warm, humid conditions. Corners, penetrations, doors and drainage details are checked before mosaic or stone conceals them.
Discuss →
Steam, finishes and commissioning
Agreed before installationWe position the steam generator, sensors and controls, and install the chosen finishes and lighting. We provide maintenance access and test the agreed system at start-up.
Discuss →What determines a hammam's cost
Complete projects start from ₸1 million. The final estimate depends not only on floor area and mosaic price, but also on heated surface area, geometry, utility readiness and equipment specifications.
Geometry and preparation
Domes, curves and complex loungers increase substrate area and the number of junctions. Before estimating, we check height, structural stability, slopes and drain positions.
Engineering specification
We price waterproofing, heating, steam generator, automation and necessary connections separately. Scope depends on room volume, finishes and intended use.
Finishes and details
Mosaic or stone, layout, glass, lighting and niches affect materials and labor. Decorative options are compared after the essential technical work is defined.
Allocate responsibilities before starting
We identify who prepares water, drainage and electrical supply, where other contractors' responsibilities end, and who checks penetrations. Equipment substitutions and additional work are agreed before execution.
Discuss the scope for my room →Water must drain; equipment must remain serviceable
Concealed penetrations and routes are difficult to correct after tiling. We first coordinate geometry, drainage, heated surfaces and the steam system, leaving access to components requiring inspection.
Where moisture comes from
A hammam has condensation and cleaning water. Drainage depends on surface geometry, slopes and connections to drains; grout alone does not replace waterproofing.
Where to position the steam generator
Equipment needs connections and maintenance space as required by the manufacturer. Service access, cleaning and replacement of consumables are planned before finishes close it in.
What to check before planning
- Height and dimensions allowing for future layers
- Water, drainage and available power
- Equipment location and inspection access
- Usage: home or commercial area
Your banya has a soul. Your project has a clear scope
saunaservice handles design, material selection, equipment supply, installation and warranty service. We work with private homes, bath complexes, salt rooms and commercial spa spaces.
Components that determine hammam performance
Waterproofing, heating and the steam system must be compatible. Checking each component separately does not replace a coordinated plan for the whole room.
Substrates and slopes
Surfaces must be stable and drainage direction planned in advance. Floor, lounger and ceiling geometry is checked before subsequent layers are applied.
This is a list of interrelated components, not an installation design. Heating, steam and ventilation parameters are determined for the property and chosen materials' documentation.
Acceptance starts before mosaics
The wet-area envelope is concealed after tiling. Preparation, junctions and penetrations are inspected in stages, and system-specified tests are completed before subsequent layers cover them.
What we check at commissioning
We check controls, surface heating, steam delivery, drainage and service access. Test procedures follow the design and equipment instructions; we explain operation and maintenance to the owner.
Types of work
Design development
Material selection
Equipment and accessories
Installation and finishing
Warranty terms
Support after handoverChoose the stage you need
A new hammam requires an integrated process. If design or preparation is already available, checking it, waterproofing or final finishing can be discussed separately.
Existing preparation must be checked
Utility drawings and photos of concealed stages are useful before continuing. If material compatibility or a penetration's condition is unconfirmed, we agree a checking method before tiling.
- Which layers and utilities are already installed
- Whether specifications and concealed-work photos are available
- What remains accessible for inspection
Hammam finishing in Almaty
Mosaic and stone are installed on a prepared substrate. This page covers geometry, materials, joints and junctions of the finishing layer.
Hammam design in Almaty
Plans and working details coordinate the dome, loungers, water, electrics and steam generator. The design helps align the work of related contractors.
Hammam waterproofing
A separate guide to the continuous protective envelope: substrates, corners, penetrations, drains and checks before tiling.
The hammam construction sequence
Concealed layers are accepted in sequence. Final finishes begin after substrates, the wet-area envelope and utility connections have been agreed.
Initial information
We clarify dimensions, usage, substrate condition, water, drainage, power and equipment position.
Design
We coordinate geometry and the engineering layout, choose a materials system and record the estimate and work boundaries.
Implementation
We carry out preparation, insulation and heating with staged inspections, then install finishes and equipment.
Checking the result
We test agreed operating conditions, drainage, controls and maintenance access.
Questions before building a hammam
Room capabilities and future usage determine the solution. Identical dimensions do not mean identical specifications for domestic and commercial hammams.
Can a hammam be built in a completed house?
Feasibility depends on height, substrates, water, drainage, electrical supply and ventilation. We first check these conditions and required alterations, then agree the interior.
Where should the steam generator be installed?
In a designated technical area with connections and access in accordance with the manufacturer's instructions. It cannot simply be concealed behind permanent finishes without maintenance access.
Is a floor drain required?
The design provides for removal of condensation and cleaning water. Drain positions, slopes and waterproofing connections are agreed before tiling.
Does mosaic itself prevent leaks?
No. Tiling and grout do not replace continuous waterproofing beneath them. Corners, penetrations, the doorway and drain connections need particular attention.
Can you continue after another team?
Yes, after assessing completed preparation. We need material information, concealed-stage photos and access to key components; unverified areas may require additional checks.
Should I choose mosaic or stone?
We compare weight, geometry, substrate and heating requirements, care and budget. The finishing material is also considered when selecting a steam generator.
How much does a turnkey hammam cost?
Complete projects start from ₸1 million. A preliminary estimate requires dimensions, room condition and specification preferences. Geometry, heated area, equipment and utility readiness significantly change the total, so we do not quote a universal area-based price.
How should the discussion start?
Leave your contact details and prepare a plan or room dimensions. We clarify connections and usage during the conversation; photos can be sent via WhatsApp, with inspections arranged separately.
Get a hammam scope and estimate
Send room dimensions and photos. We will clarify the inputs and explain the next step needed for a preliminary scope and estimate.
By pressing the button, you agree to the processing of your contact details so we can respond to your inquiry.
We could not confirm submission. You can try again or open the prepared WhatsApp message and send it yourself.
Open WhatsAppReady for a site survey? Agree arrangements and a time on WhatsApp →





