Turnkey hammam in Almaty

We create hammams in homes and spas in Almaty. Complete projects start from ₸1 million: before mosaic installation, we agree substrates, slopes, waterproofing, heating, steam generator and maintenance access.

Get a hammam scope and estimate Finishing a prepared hammam We work in Almaty, Kaskelen, Talgar, Esik, Uzynagash and Konaev. Site visit arrangements and timing are agreed in advance.

Ideas for your steam room

Design visualizations, not photos of completed projects.

Three foundations of your future hammam

01Watertight wet-area envelope
02Agreed connections
03Maintenance access
Who we help

What stage is your hammam at?

Modern sauna in a private home

You have a room at home

You need to know whether there is enough height, where equipment will go and how moisture will be removed. We check the initial constraints before choosing mosaics.

Discuss your requirements →
Timber steam room finish — an illustration of the service

You are planning a spa area

Frequent use affects the steam generator, water treatment, maintenance and drying. The operating schedule sets the design requirements.

Discuss your requirements →
Hammam with stone finishes

Preparation has already started

Substrates or utilities have been installed by another team. Slopes, penetrations and compatibility of existing decisions must be checked before continuing.

Discuss your requirements →
Services

The hammam as a complete wet-area system

The scope covers work inside the steam room and agreed equipment. External utility connections, changes to load-bearing structures and building construction require separate consideration.

Timber banya finishing

Substrates and drainage

Agreed before installation

We check geometry, form surfaces and coordinate drains. Lounger, dome and penetration positions are agreed with layer thicknesses and drainage direction in mind.

Discuss →
Modern sauna

Waterproofing and heating

Agreed before installation

We select a compatible system for warm, humid conditions. Corners, penetrations, doors and drainage details are checked before mosaic or stone conceals them.

Discuss →
Hammam with stone finishes

Steam, finishes and commissioning

Agreed before installation

We position the steam generator, sensors and controls, and install the chosen finishes and lighting. We provide maintenance access and test the agreed system at start-up.

Discuss →
Scope and cost

What determines a hammam's cost

Complete projects start from ₸1 million. The final estimate depends not only on floor area and mosaic price, but also on heated surface area, geometry, utility readiness and equipment specifications.

01 / Geometry and preparation

Geometry and preparation

Domes, curves and complex loungers increase substrate area and the number of junctions. Before estimating, we check height, structural stability, slopes and drain positions.

02 / Engineering specification

Engineering specification

We price waterproofing, heating, steam generator, automation and necessary connections separately. Scope depends on room volume, finishes and intended use.

03 / Finishes and details

Finishes and details

Mosaic or stone, layout, glass, lighting and niches affect materials and labor. Decorative options are compared after the essential technical work is defined.

Allocate responsibilities before starting

We identify who prepares water, drainage and electrical supply, where other contractors' responsibilities end, and who checks penetrations. Equipment substitutions and additional work are agreed before execution.

Discuss the scope for my room →
Humid steam room

Water must drain; equipment must remain serviceable

Concealed penetrations and routes are difficult to correct after tiling. We first coordinate geometry, drainage, heated surfaces and the steam system, leaving access to components requiring inspection.

Warm steam room with soft lighting and natural steam

Where moisture comes from

A hammam has condensation and cleaning water. Drainage depends on surface geometry, slopes and connections to drains; grout alone does not replace waterproofing.

Specialist checking sauna finishes and materials

Where to position the steam generator

Equipment needs connections and maintenance space as required by the manufacturer. Service access, cleaning and replacement of consumables are planned before finishes close it in.

What to check before planning

  • Height and dimensions allowing for future layers
  • Water, drainage and available power
  • Equipment location and inspection access
  • Usage: home or commercial area
01Site survey
02Design
03Materials
04Installation
From the first survey to a finished hammam, with agreed materials, scope and stages.
Sauna finishing materials
About us

Your banya has a soul. Your project has a clear scope

saunaservice handles design, material selection, equipment supply, installation and warranty service. We work with private homes, bath complexes, salt rooms and commercial spa spaces.

Technology

Components that determine hammam performance

Waterproofing, heating and the steam system must be compatible. Checking each component separately does not replace a coordinated plan for the whole room.

Interactive diagram of technology in a modern banya
01 / Substrates and slopes

Substrates and slopes

Surfaces must be stable and drainage direction planned in advance. Floor, lounger and ceiling geometry is checked before subsequent layers are applied.

This is a list of interrelated components, not an installation design. Heating, steam and ventilation parameters are determined for the property and chosen materials' documentation.

Quality and standards

Acceptance starts before mosaics

The wet-area envelope is concealed after tiling. Preparation, junctions and penetrations are inspected in stages, and system-specified tests are completed before subsequent layers cover them.

What we check at commissioning

We check controls, surface heating, steam delivery, drainage and service access. Test procedures follow the design and equipment instructions; we explain operation and maintenance to the owner.

Types of work

Design development
Material selection
Equipment and accessories
Installation and finishing
Warranty terms
Support after handover
Example solutions

Choose the stage you need

A new hammam requires an integrated process. If design or preparation is already available, checking it, waterproofing or final finishing can be discussed separately.

Humid steam room

Existing preparation must be checked

Utility drawings and photos of concealed stages are useful before continuing. If material compatibility or a penetration's condition is unconfirmed, we agree a checking method before tiling.

  • Which layers and utilities are already installed
  • Whether specifications and concealed-work photos are available
  • What remains accessible for inspection
01 / Final surface

Hammam finishing in Almaty

Mosaic and stone are installed on a prepared substrate. This page covers geometry, materials, joints and junctions of the finishing layer.

02 / Engineering layout

Hammam design in Almaty

Plans and working details coordinate the dome, loungers, water, electrics and steam generator. The design helps align the work of related contractors.

03 / Wet-area envelope

Hammam waterproofing

A separate guide to the continuous protective envelope: substrates, corners, penetrations, drains and checks before tiling.

Discuss your steam room's condition →

saunaservice on Instagram →

Working together

The hammam construction sequence

Concealed layers are accepted in sequence. Final finishes begin after substrates, the wet-area envelope and utility connections have been agreed.

Initial information

We clarify dimensions, usage, substrate condition, water, drainage, power and equipment position.

Design

We coordinate geometry and the engineering layout, choose a materials system and record the estimate and work boundaries.

Implementation

We carry out preparation, insulation and heating with staged inspections, then install finishes and equipment.

Checking the result

We test agreed operating conditions, drainage, controls and maintenance access.

Before you contact us

Questions before building a hammam

Room capabilities and future usage determine the solution. Identical dimensions do not mean identical specifications for domestic and commercial hammams.

Can a hammam be built in a completed house?

Feasibility depends on height, substrates, water, drainage, electrical supply and ventilation. We first check these conditions and required alterations, then agree the interior.

Where should the steam generator be installed?

In a designated technical area with connections and access in accordance with the manufacturer's instructions. It cannot simply be concealed behind permanent finishes without maintenance access.

Is a floor drain required?

The design provides for removal of condensation and cleaning water. Drain positions, slopes and waterproofing connections are agreed before tiling.

Does mosaic itself prevent leaks?

No. Tiling and grout do not replace continuous waterproofing beneath them. Corners, penetrations, the doorway and drain connections need particular attention.

Can you continue after another team?

Yes, after assessing completed preparation. We need material information, concealed-stage photos and access to key components; unverified areas may require additional checks.

Should I choose mosaic or stone?

We compare weight, geometry, substrate and heating requirements, care and budget. The finishing material is also considered when selecting a steam generator.

How much does a turnkey hammam cost?

Complete projects start from ₸1 million. A preliminary estimate requires dimensions, room condition and specification preferences. Geometry, heated area, equipment and utility readiness significantly change the total, so we do not quote a universal area-based price.

How should the discussion start?

Leave your contact details and prepare a plan or room dimensions. We clarify connections and usage during the conversation; photos can be sent via WhatsApp, with inspections arranged separately.

Next step

Get a hammam scope and estimate

Send room dimensions and photos. We will clarify the inputs and explain the next step needed for a preliminary scope and estimate.

Enter a number starting with 8, +7, or just 10 digits; the format adjusts automatically.
How would you prefer to be contacted?

By pressing the button, you agree to the processing of your contact details so we can respond to your inquiry.

Ready for a site survey? Agree arrangements and a time on WhatsApp →

Timber for steam room finishing — material example
Partners

Materials and equipment specified for the project

A wet area requires compatible substrates, heating, waterproofing and finishes. Specific systems and equipment are listed in the specification; substitutions are checked before installation.

Rams Knauf Dom Dom Alina Akres Vagonka